Compare Chinese supplier quotations on the same specification, order quantity, packaging and delivery basis before ranking them by unit price. Put each supplier’s offer in one sheet, showing what is included, what costs extra, what starts production and which answers are still pending. Then decide which offer fits your first order and operating needs.
Confirm what each supplier priced
Start with the current product brief and use the same RFQ specification as the reference for every supplier. Record the drawing or specification version each supplier used. Check the materials, dimensions, tolerances where relevant, finish, accessories, functions and packaging. If a supplier proposes a substitution, record the proposed change and the price that applies to it in a separate entry. Keep the original requirement visible so you can decide whether the alternative is acceptable before comparing its price.
Identify the sample associated with each offer and record whether it has already been reviewed or is still to be produced. When pricing or production depends on a sample decision, attach the specific sample approval record so the comparison shows which decision the supplier is working from.
Build the comparison around your first order
Use one column per supplier and one row per requirement. Put your target quantity, packaging and delivery point beside the supplier columns so any difference is easy to spot. Enter the supplier’s stated terms and keep the unit price tied to the quantity and scope for which it was quoted.
| Comparison row | What to record and verify |
|---|---|
| Quantity and minimum order | Record the quantity behind the quoted unit price and the minimum order. If either differs from your planned first order, ask what price and quantity the supplier can confirm for that order. |
| Currency and validity | Record the quoted currency and how long the offer is valid. If the validity period has passed, ask the supplier to confirm the terms again before relying on them. |
| Packaging and labels | List the materials and label tasks included in the price. Mark any packaging option still awaiting your approval and check which option the supplier priced. |
| Sample and setup charges | List charges that sit outside the unit price. Identify which recur and which depend on an approval, where those conditions apply. |
| Production timing | Record the stated lead time, the event that starts it and whether the goods-ready date is estimated or confirmed. |
| Delivery basis | Record where the supplier’s delivery responsibility ends. If your plan depends on receipt at a specific warehouse in China, ask whether delivery to that warehouse is included. |
| Exclusions | List excluded services, documents and charges. Flag anything your order still requires so it remains visible when you compare offers. |
If the supplier uses a pro forma invoice, the U.S. International Trade Administration explains what is commonly included in this quotation in invoice format. Use the reference to understand the document and confirm the terms for your own transaction with the supplier.
Check when production starts and goods will be ready
Ask what has to happen before the quoted production period starts. The answer may depend on receipt of the deposit, material availability, artwork approval or sample confirmation. Record which conditions have been met and which are pending. Keep estimated dates separate from confirmed milestones so you can see what still needs to happen before you can plan around the goods-ready date.
If you plan to consolidate goods from several suppliers, put their goods-ready windows side by side. A late product can affect the planned shipment. Decide which goods can wait for the rest and which might need a separate dispatch.
Resolve gaps that could change your choice
Mark each relevant entry as confirmed, proposed or unresolved. Treat a blank or ambiguous entry as unresolved until the supplier confirms it in writing. For each question, record the requirement, the answer you need, and who confirmed the answer and when. If the answer changes the specification, packaging or delivery scope, update that row so your decision reflects the revised offer.
Clarify the next approval steps before placing an order. Ask what needs to happen if the sample or inspection identifies an issue. If a packaging or sample decision is still open when you choose a preferred supplier, carry it forward as an explicit approval item.
Choose the offer that fits the whole order
Review the proposed product, commercial terms, timing and open questions alongside the supplier’s communication and your operating needs. Compare unit prices where the scope matches. For any remaining difference, decide whether you can accept it and account for any stated separate charges. Use the quotation to understand the terms offered and keep the relevant approvals and checks in place for production, inspection and delivery.
Carry open items into order follow-up
Once you have a preferred option, transfer remaining specification decisions, sample approvals, packaging choices and purchase milestones into the order follow-up record. Keep the relevant supplier responses with those items so whoever handles supplier coordination and order follow-up can see what was agreed and what still needs a decision.
If you also need to compare service costs, review what a sourcing and fulfillment quotation should include. This ChengBridge guide provides general buyer guidance. Confirm the requirements and service scope for your specific goods before making arrangements. You can send ChengBridge your current requirements to discuss the service scope.